Gulf Stream
General contractor in Gulf Stream.
Any job in Gulf Stream, from a repair to a new house.
- Licensed since
- 1994
- On the coast
- Over 25 years
- Pricing
- Open book

GCS Palm Beach takes jobs in Gulf Stream, on A1A south of Ocean Ridge and Briny Breezes.
- Licensed since
- 1994
- On the coast
- Over 25 years
- Pricing
- Open book
Any job, large or small.
A leak, a bath, a kitchen, a pool, a whole-house renovation, or a teardown and a new house.
Open book. You see every cost.


- New houses
- Renovations
- Pools
- Repairs
Staff, the board, or the Commission.
Any exterior change starts with a pre-application meeting with the Town Manager and staff, which sets the review level. Under 300 square feet, staff decides. Larger work, discouraged styles, or removing more than two trees over 8 inches caliper go to the Architectural Review and Planning Board.
New homes and work on more than half the floor area go to the Town Commission after the board recommends. The ARPB meets the fourth Thursday of the month at 8:30 a.m.

December to April, quieter.
From December 1 through April 30, work runs non-holiday weekdays 8:00 a.m. to 5:00 p.m., and Saturdays only inside a fully enclosed structure. Pile driving, jackhammering and dry sandblasting wait for May.

Down A1A from the island.
- Palm BeachOver 25 years on the island
- South Palm BeachIts own Building Department
- ManalapanIts own Architectural Commission
- Boynton Inlet
- Ocean RidgeThe whole Town in a flood hazard area
- Briny Breezes
- Gulf StreamPermits through Highland Beach
- Delray BeachFive historic districts
- Highland BeachPlanning Board on every new house
- Boca RatonSeawalls at plus 5.00 feet
The Town of Gulf Stream
Two towns, one permit.
Gulf Stream sets the zoning and the review; Highland Beach issues the building permit. These lines are from the Town’s pages.
- 01
Pre-application
A meeting with the Town Manager and staff, with plans and elevations, before any exterior change. It sets the review level.
The Town’s review process (opens the official site) - 02
The permit
Issued and inspected by Highland Beach, a separate town with its own Building Department, on its forms, fully digital. Every permit includes the signed first page of the Gulf Stream Construction Handbook.
Highland Beach’s Building Department (opens the official site) - 03
Registration
Everyone hired to work at a property registers with the Town. Commercial vehicles carry the Town decal.
Contractor registration (opens the official site) - 04
The hours
May 1 to November 30, weekdays and Saturdays 8:00 a.m. to 5:00 p.m. December 1 to April 30, weekdays, and Saturdays only fully enclosed. No work on the six major holidays.
Work hours (opens the official site)
From the published rules, checked October 2026. Rules change; check the Town’s permits page (opens the official site) for your property.
Questions
Not here? Ask Philip.
Who issues building permits in Gulf Stream?
The Town of Highland Beach, under an interlocal agreement with Gulf Stream, handles all building permits and inspections, fully digitally. Highland Beach is a separate town with its own Building Department. Gulf Stream keeps its zoning authority, and its requirements and fees come first.
Can contractors work on Saturdays in Gulf Stream in winter?
From December 1 through April 30, only inside a fully enclosed structure, so no noise, dust or light reaches other properties. From May 1 through November 30, Saturdays run 8:00 a.m. to 5:00 p.m.
What does the Gulf Stream ARPB review?
Level 2 projects, such as an expansion of more than 300 square feet but under half the floor area, discouraged styles or materials, or removing more than two trees over 8 inches caliper. New homes and larger work go on to the Town Commission after the ARPB recommends.
Do contractors register with the Town of Gulf Stream?
Yes. Everyone hired to work at a property registers with the Town, at Town Hall or by email, and commercial vehicles carry the Town’s decal on the driver’s side rear bumper.