North Palm Beach
General contractor in North Palm Beach.
Any job in North Palm Beach, from a repair to a new house.
- Licensed since
- 1994
- On the island
- Over 25 years
- Pricing
- Open book

GCS Palm Beach takes jobs in the Village of North Palm Beach, south of Jupiter and east of Palm Beach Gardens.
- Licensed since
- 1994
- On the island
- Over 25 years
- Pricing
- Open book
The Village, all online.
North Palm Beach’s ZIP codes are shared with its neighbors, so the address alone does not settle who permits. The Property Appraiser’s list of permit offices is the first check.
In the Village, permits go to the Building Division, 701 U.S. Highway 1, Suite 100, open Monday to Friday, 7 a.m. to 3 p.m. Every submittal goes through MGO, My Government Online; the Village no longer accepts paper. Contractors complete the Village’s MGO registration first, and work started before the permit is issued is penalized.

A repair to a new house.
A leak, a bath, a kitchen, a whole-house renovation, or a teardown and a new house. A pool, an outdoor kitchen or a seawall, as part of the house or on its own.
Open book. You see every cost.


- New houses
- Renovations
- Pools and outdoor kitchens
- Seawalls
- Repairs
The hours and the site rules.
Village Code Sec. 19-105, amended in 2025: no construction work causing unreasonable noise between 5:30 p.m. and 8:00 a.m., no start before 9:00 a.m. on Saturdays, and no construction on Sundays or legal holidays. The village manager can grant a special permit.
Since Ordinance 2025-01, every active site needs a six-foot chain-link fence with screening, put up once the permit is issued, gates locked when no one is working, and the dumpsters and portable toilets inside it. Construction waste stays in an enclosed container, and construction vehicles may not park overnight in the right-of-way. The owner and the contractor are jointly responsible, and the building official can stop the work.

No appearance board for a house.
Under Village Code Sec. 6-59, permits for a single-family house and its normal accessory structures are exempt from the Planning, Zoning and Adjustment Board’s site plan and appearance approval. The Board reviews multifamily, commercial, mixed-use and industrial buildings.
The zoning still shapes the house. In the R-1 district, the Village’s single-family handout limits a house to two stories and 30 feet, the second floor to 75 percent of the first, and the front setback to 25 feet for the first story and 30 for the second.
A seawall permit needs a current boundary survey with an engineer’s signed and sealed overlay of the work, showing every waterward extension from the rear property line.

The Village of North Palm Beach
Registered in MGO, then the permit.
The Village’s own Building Division, its own portal and its own hours, from the Village’s pages and Code.
- 01
The address
Village, County or a neighboring city: the Property Appraiser lists each permit office.
The permit offices (opens the official site) - 02
Registration
The contractor completes the Village’s MGO registration before applying, and keeps license and insurance current.
The Building Division (opens the official site) - 03
The permit
A new house: the owner’s signature, sealed plans, the survey, the lot coverage worksheet and, where it applies, the design flood elevation form.
The single-family checklist (opens the official site) - 04
The site
A six-foot screened fence, dumpsters and toilets inside it, waste contained: Ordinance 2025-01.
Village Code Chapter 6 (opens the official site) - 05
The hours
8:00 a.m. to 5:30 p.m. on weekdays; Saturdays from 9:00 a.m.; no construction on Sundays or legal holidays.
Village Code Sec. 19-105 (opens the official site) - 06
On the water
A seawall permit: a current survey with the engineer’s sealed overlay of the work.
The seawall checklist (opens the official site)
From the published rules, checked October 2026. Rules change; check the Village’s Building Division (opens the official site) for your property.
Questions
Not here? Ask Philip.
What are the construction hours in North Palm Beach?
Village Code Sec. 19-105, amended in 2025: no construction work causing unreasonable noise between 5:30 p.m. and 8:00 a.m., no start before 9:00 a.m. on Saturdays, and no construction on Sundays or legal holidays. The village manager can grant a special permit.
Does a house in North Palm Beach need appearance board approval?
No. Under Village Code Sec. 6-59, permits for a single-family house and its normal accessory structures are exempt from the Planning, Zoning and Adjustment Board’s site plan and appearance approval. The Board reviews multifamily, commercial, mixed-use and industrial buildings.
How do permits work in North Palm Beach?
Through the Village’s Building Division, 701 U.S. Highway 1, Suite 100. Every submittal goes through the MGO (My Government Online) portal; the Village no longer accepts paper. Contractors complete the Village’s MGO registration before applying.
What does North Palm Beach require on a construction site?
Since 2025 (Ordinance 2025-01): a six-foot screened chain-link fence once a permit is issued, gates locked when no one is working, dumpsters and portable toilets inside the fence, and waste in an enclosed container. The owner and the contractor are jointly responsible.
How big can a two-story house be in North Palm Beach?
In the R-1 district, the Village’s handout limits single-family houses to two stories and 30 feet, with the second floor no more than 75 percent of the first, and front setbacks of 25 feet for the first story and 30 for the second.