Skip to content

Manalapan

General contractor in Manalapan.

Any job in Manalapan, from a repair to a new house.

Licensed since
1994
On the coast
Over 25 years
Pricing
Open book
Estate seen across a wide lawn lined with palms
House

GCS Palm Beach takes jobs in Manalapan, south of Palm Beach on A1A, between the ocean and the Lake Worth Lagoon.

Licensed since
1994
On the coast
Over 25 years
Pricing
Open book
i.The jobs

A repair to a new house.

The same list as on the island: a leak, a bath, a kitchen, a pool, a whole-house renovation, or a teardown and a new house.

Open book. You see every cost.

White two-story waterfront house with a long balcony over the seawall
HouseColumned balcony, seawall
Freeform pool on a marble deck by the water
PoolFreeform pool, stone deck, spa
  • New houses
  • Renovations
  • Pools
  • Repairs
ii.The Commission

Paint, tile, a fence: the Commission sees it.

Manalapan’s Architectural Commission approves any exterior change, down to a new paint or roof tile color, shutters, fences, landscaping and seawalls. It meets the first Thursday of each month at 10:00 a.m.

Applications go through MGO. The Town’s fees run by level, from $450 for Level 1 to $2,500 for Level 4: a new house, or work on 50 percent or more of the floor area.

Iron gate across a paver drive, the house beyond among palms
Gate and drive
iii.The site

A parking plan before the first truck.

The Town Code wants a parking plan approved before work starts, side-yard screening within two weeks of the first permit, a 6-foot temporary fence, a covered dumpster and a portable toilet. Where possible, neighbors get 24 hours’ notice before loud work.

Aerial view of a clubhouse being framed on a cleared site, roof trusses laid out on the sand
On site
North to south

Down A1A from the island.

  1. Palm BeachOver 25 years on the island
  2. South Palm BeachIts own Building Department
  3. ManalapanIts own Architectural Commission
  4. Boynton Inlet
  5. Ocean RidgeThe whole Town in a flood hazard area
  6. Briny Breezes
  7. Gulf StreamPermits through Highland Beach
  8. Delray BeachFive historic districts
  9. Highland BeachPlanning Board on every new house
  10. Boca RatonSeawalls at plus 5.00 feet

The Town of Manalapan

Registered first, then the Commission.

Its own Building Department, its own Commission and its own hours, from the Town’s pages and Code.

  1. 01

    Registration

    Every contractor and subcontractor registers with the Town in MGO before any work. New permits are applied for in MGO too.

    The Building Department (opens the official site)
  2. 02

    The Architectural Commission

    Any exterior change, including paint and roof tile color, shutters, fences, landscaping and seawalls. First Thursday of the month, 10:00 a.m.

    The Commission’s page (opens the official site)
  3. 03

    The hours

    Monday through Saturday, 8:00 a.m. to 6:30 p.m. No Sundays or major holidays, with four holidays excepted.

    Construction hours (opens the official site)
  4. 04

    The site

    An approved parking plan, side-yard screening within two weeks, no heavy equipment parked in the right-of-way, dirt piles no higher than 6 feet above the road crown.

    Town Code 152.110 (opens the official site)

From the published rules, checked October 2026. Rules change; check the Town’s Building Department (opens the official site) for your property.

Questions

Not here? Ask Philip.

  1. What needs Architectural Commission approval in Manalapan?

    Any exterior change: additions and alterations, shutters, fences, a new exterior paint or roof tile color, and any change to the landscaping or a seawall. The Commission meets the first Thursday of each month at 10:00 a.m. at Town Hall.

  2. What are the construction hours in Manalapan?

    Monday through Saturday, 8:00 a.m. to 6:30 p.m. No construction on Sundays or major holidays, except Martin Luther King Day, Presidents’ Day, Veterans Day and the Friday after Thanksgiving.

  3. Who issues building permits in Manalapan?

    The Town of Manalapan’s own Building Department. New permits are applied for online in MGO, and every contractor and subcontractor registers with the Town in MGO first.

  4. Where do construction vehicles park in Manalapan?

    By an approved parking plan. The Town Code requires the plan before work starts, allows light vehicles on the front swale only if approved, and never allows heavy equipment to park in the right-of-way.

GCS

In Manalapan?

Call or text Philip.

Save contact