West Palm Beach
General contractor in West Palm Beach.
Any job in West Palm Beach, from a repair to a new house.
- Licensed since
- 1994
- On the island
- Over 25 years
- Pricing
- Open book

GCS Palm Beach takes jobs in West Palm Beach, the county seat, across the Lake Worth Lagoon from the Town of Palm Beach.
- Licensed since
- 1994
- On the island
- Over 25 years
- Pricing
- Open book
The City, or the County.
A West Palm Beach address is not always the City: some neighborhoods that carry one sit outside it, and their permits come from the County or another town. The Property Appraiser’s list of permit offices is the first check.
Inside the City, permits go to the Development Services Building Division, 401 Clematis Street, open Monday to Friday, 8 to 5. The City runs permitting fully online in its EPL system: the permit is applied for, paid and tracked in the Civic Access portal, and inspections are booked there.

A repair to a new house.
A leak, a bath, a kitchen, a whole-house renovation, or a teardown and a new house. A pool or an outdoor kitchen, as part of the house or on its own.
Open book. You see every cost.


- New houses
- Renovations
- Pools and outdoor kitchens
- Repairs
Construction hours, Sundays included.
City Code Sec. 34-72: construction that makes noise, vibration or dust starts no earlier than 7:00 a.m. and stops at 7:00 p.m., Monday through Friday, and runs from 8:00 a.m. to 8:00 p.m. on Saturday and Sunday.
Unlike Boca Raton, Jupiter or North Palm Beach, West Palm Beach does not bar Sunday construction. The building official can authorize an earlier start or a later finish at a particular site, which may come with notice to the neighbors.

Eighteen districts and three levels of review.
The City’s historic preservation program covers 18 locally designated historic districts and 46 individually designated sites. Work that changes the exterior needs a Certificate of Appropriateness; interior remodeling is not reviewed.
Review comes at three levels: Staff Level 1 with the building permit, Staff Level 2 as a minor certificate staff can approve, and the Historic Preservation Board for the major ones, such as new construction, demolition and most additions. The Board meets on the fourth Tuesday of the month, unless it adjusts the date.
Non-contributing houses in a district are reviewed too, for size, massing and placement. Historic staff review every demolition permit in the City. A local tax program can exempt qualifying improvements from City and County tax increases for up to ten years, if the owner applies before work starts.

The City of West Palm Beach
Registered first, then Civic Access.
The City’s own Building Division, its own historic board and its own hours, from the City’s pages and Code.
- 01
The address
City, County or a neighboring town: the Property Appraiser lists each permit office.
The permit offices (opens the official site) - 02
Registration
The contractor sends the City a license, a business tax receipt, and liability and workers’ compensation certificates naming the City.
The Building Division’s questions (opens the official site) - 03
In a historic district
A Certificate of Appropriateness for exterior work, from staff or the Historic Preservation Board depending on the job; historic staff review every demolition permit in the City.
Historic preservation (opens the official site) - 04
The permit
Applied for, paid and tracked in the Civic Access portal. The City puts a code-compliant residential remodel at about 3 weeks.
Apply for a permit (opens the official site) - 05
The hours
Weekdays 7:00 a.m. to 7:00 p.m.; Saturday and Sunday 8:00 a.m. to 8:00 p.m.
City Code Chapter 34 (opens the official site) - 06
Flood
The City’s flood map shows a parcel’s base flood elevation. In a flood zone, a large renovation can trigger the 50 percent rule .
Flood information (opens the official site)
From the published rules, checked October 2026. Rules change; check the City’s Building Division (opens the official site) for your property.
Questions
Not here? Ask Philip.
What are the construction hours in West Palm Beach?
City Code Sec. 34-72: construction work that makes noise, vibration or dust may run from 7:00 a.m. to 7:00 p.m. Monday through Friday, and from 8:00 a.m. to 8:00 p.m. on Saturday and Sunday. The building official can authorize work earlier or later at a particular site, which may come with notice to the neighbors (Sec. 34-42).
Who issues building permits in West Palm Beach?
Inside the City, the Development Services Building Division at 401 Clematis Street, open Monday through Friday, 8 to 5. Permits are applied for, tracked and paid in the City’s Civic Access portal, part of its all-digital EPL system, and inspections are booked there too.
Does a contractor have to register with the City of West Palm Beach?
Yes. The contractor emails the City a state or county license, a local business tax receipt, and general liability and workers’ compensation certificates naming the City as certificate holder. The City asks for 1 to 2 business days to process it.
Do I need approval to renovate a house in a West Palm Beach historic district?
For work that changes the exterior, yes: a Certificate of Appropriateness, at staff level for smaller items or from the Historic Preservation Board for the larger ones. Non-contributing houses in a district are reviewed too. Interior remodeling is not reviewed by historic staff.
Is my West Palm Beach address in the City?
Not always: some neighborhoods with a West Palm Beach address sit outside the City, in unincorporated Palm Beach County or another municipality, each with its own permit office. The Property Appraiser lists every one, the place to check first.