Skip to content

Highland Beach

General contractor in Highland Beach.

Any job in Highland Beach, from a repair to a new house.

Licensed since
1994
On the coast
Over 25 years
Pricing
Open book
Single story white house with flat tile roof wrapping a pool, round spa and stainless outdoor grill station, with walls of glass doors
Pool and outdoor kitchen

GCS Palm Beach takes jobs in the Town of Highland Beach, on the barrier island between Delray Beach and Boca Raton.

Licensed since
1994
On the coast
Over 25 years
Pricing
Open book
i.Who permits

The Town’s own Building Department.

The Town of Highland Beach has its own Building Department, at 3616 S Ocean Boulevard. Every new submittal and revision goes in online through the Town’s MyGovernmentOnline portal, on the January 2024 edition of the countywide permit application only. Every trade has its own child permit under the main one.

An application is not accepted without its full checklist: among the items, a cost estimate signed by both the owner and the applicant, the signed acknowledgement of the Town’s construction site handbook, a recorded Notice of Commencement, and sealed plans with the job address and owner on every page.

Narrow reflecting pool and keystone walk beside a white house with copper lanterns and a row of palms
Reflecting pool and walk
ii.The jobs

A repair to a new house.

A leak, a bath, a kitchen, a whole-house renovation, or a teardown and a new house. A pool, an outdoor kitchen or a dock, as part of the house or on its own.

Open book. You see every cost.

White pool house with curved gables and French doors among palms, with a blue glass tile spa in the foreground
Pool house and spa
Pool with travertine deck beside a white cabana with standing seam roof and wood slat outdoor shower, cedar pergola seating behind
Pool and cabana
  • New houses
  • Renovations
  • Pools and outdoor kitchens
  • Docks and seawalls
  • Repairs
iii.The hours

Weekdays, and a quiet Saturday.

Town Code Sec. 12-6: work that needs a permit runs 8:00 a.m. to 6:00 p.m. on weekdays and 9:00 a.m. to 3:00 p.m. on Saturdays. None on Sundays, or on New Year’s Day, Memorial Day, July 4th, Labor Day, Thanksgiving and Christmas.

Saturday is quiet work only: no dumpsters or portable toilets moved, no forklift deliveries, no concrete deliveries or pumping, no dump trucks, backhoes or cranes, no compressors, generators or nail guns, no jackhammering. Workers may not arrive more than half an hour before the start or leave more than half an hour after the end, and no music is allowed on a site at any time.

Concrete roof deck with rebar, the ocean beyond
On site
iv.The Planning Board

Every new house goes to the Planning Board.

Under Town Code Sec. 30-38, the Planning Board approves or denies the site plan of every single-family dwelling, and only then can the building permit be issued. Major modifications to an existing house, a new facade, roof line, height or footprint, are reviewed the same way; interior work and window or door changes are approved by the Building Official.

The Board is the final authority on docks, piers and boat lifts, reviewed as special exceptions; a boat lift may stand no taller than base flood elevation plus eight feet.

On the ocean side, no fences or walls are allowed east of the state Coastal Construction Control Line without Florida DEP approval. If the dune is disturbed, the final grade must be at least 18 feet above mean sea level. The Town treats all its land as subject to flooding or wave damage. Beachfront lighting follows its sea turtle rules; the Town says it has more nests a year than Boca Raton or Delray Beach, and nesting season runs March 1 to October 31. More on building at the water .

Rear of a white estate with gray tile hipped roofs, pool terrace with lounge chairs and lawn, stone steps rising from a wood deck
Estate and pool terrace
North to south

Down A1A from the island.

  1. Palm BeachOver 25 years on the island
  2. South Palm BeachIts own Building Department
  3. ManalapanIts own Architectural Commission
  4. Boynton Inlet
  5. Ocean RidgeThe whole Town in a flood hazard area
  6. Briny Breezes
  7. Gulf StreamPermits through Highland Beach
  8. Delray BeachFive historic districts
  9. Highland BeachPlanning Board on every new house
  10. Boca RatonSeawalls at plus 5.00 feet

The Town of Highland Beach

Registered, the Board, then the permit.

The Town’s own Building Department, its own board and its own hours, from the Town’s pages and Code.

  1. 01

    Registration

    Every contractor and every non-permit trade registers with the Town on MyGovernmentOnline, at no fee.

    The Town’s licensing notice (opens the official site)
  2. 02

    The Planning Board

    Site plan approval for every new house, and for a major exterior change, before the permit.

    The Planning Board (opens the official site)
  3. 03

    The application

    A cost estimate signed by owner and applicant, the handbook acknowledgement, the recorded Notice of Commencement, sealed plans.

    The permit checklist (opens the official site)
  4. 04

    The hours

    Weekdays 8:00 a.m. to 6:00 p.m.; Saturdays 9:00 a.m. to 3:00 p.m., quiet work only; never Sundays or six holidays.

    Town Code Chapter 12 (opens the official site)
  5. 05

    The beach

    Nothing east of the Coastal Construction Control Line without the state; a disturbed dune graded back to 18 feet above mean sea level.

    Town Code Chapter 30 (opens the official site)
  6. 06

    Sea turtles

    Beachfront lighting follows the Town’s sea turtle rules; nesting season runs March 1 to October 31.

    Sea turtles (opens the official site)

From the published rules, checked October 2026. Rules change; check the Town’s Building Department (opens the official site) for your property.

Questions

Not here? Ask Philip.

  1. What are the construction hours in Highland Beach?

    Town Code Sec. 12-6: permitted work only from 8:00 a.m. to 6:00 p.m. on weekdays and 9:00 a.m. to 3:00 p.m. on Saturdays, never on Sundays or on New Year’s Day, Memorial Day, July 4th, Labor Day, Thanksgiving or Christmas. On Saturdays, no concrete, dumpsters, heavy equipment, compressors, generators or nail guns, and workers may not arrive more than half an hour early or stay more than half an hour late.

  2. Does a new house in Highland Beach need Planning Board approval?

    Yes. Under Town Code Sec. 30-38, the Planning Board approves or denies the site plan of every single-family dwelling before the building permit is issued. Major modifications to an existing house, such as a new facade, roof line or footprint, are reviewed the same way; minor ones, like interior work or a window change, are approved by the Building Official.

  3. Do contractors have to register with the Town of Highland Beach?

    Yes, every contractor, at no fee, on the Town’s MyGovernmentOnline portal, including trades that do not pull their own permits, such as framers, drywall, plaster, painting and window installers. Since July 1, 2025, permits go only to state-licensed or County-registered contractors who have registered with the Town.

  4. Can I build on the dune in Highland Beach?

    Only with Town and state approval. No fences or walls are allowed east of the state Coastal Construction Control Line unless state law allows them and the Florida DEP approves. If the dune is disturbed, the final grade must be at least 18 feet above mean sea level, and a dune walkover needs site plan review and Planning Board approval.

  5. Who issues Gulf Stream’s building permits?

    The Town of Highland Beach, under an interlocal agreement with Gulf Stream, through a separate Gulf Stream portal listed on its Building Department page. Gulf Stream keeps its own zoning and design review.

GCS

In Highland Beach?

Call or text Philip.

Save contact