South Palm Beach
General contractor in South Palm Beach.
Any job in South Palm Beach, from a repair to a whole condo unit.
- Licensed since
- 1994
- On the coast
- Over 25 years
- Pricing
- Open book

GCS Palm Beach takes jobs in South Palm Beach, the town directly south of the Town of Palm Beach on A1A.
- Licensed since
- 1994
- On the coast
- Over 25 years
- Pricing
- Open book
A repair, a bath, a whole unit.
The same jobs as on the island: a kitchen, a bath, every room of a condo unit, or the list before a closing.
Open book. You see every cost.


- Condo units
- Kitchens
- Baths
- Repairs
The owner, the builder and the building.
The Town’s master permit is signed by the homeowner, the general contractor and the condo or HOA representative. A remodel adds a floor plan and the scope of work.
Everything is filed online in MGO, under the Town of South Palm Beach, never the County. The Town doesn’t accept the County-wide permit application.

Just south of Palm Beach.
South Palm Beach borders the Town of Palm Beach on the south, on A1A. Philip has worked on the island for over 25 years; this is the same road, one town down.

Down A1A from the island.
- Palm BeachOver 25 years on the island
- South Palm BeachIts own Building Department
- ManalapanIts own Architectural Commission
- Boynton Inlet
- Ocean RidgeThe whole Town in a flood hazard area
- Briny Breezes
- Gulf StreamPermits through Highland Beach
- Delray BeachFive historic districts
- Highland BeachPlanning Board on every new house
- Boca RatonSeawalls at plus 5.00 feet
The Town of South Palm Beach
Filed with the Town, never the County.
Its own building department, its own portal and its own hours. These are the lines from the Town’s permit page.
- 01
The permit
Online in MGO, Town of South Palm Beach as the jurisdiction. A Notice of Commencement for work of $5,000 or more ($15,000 for an A/C replacement).
The Town’s permit page (opens the official site) - 02
The hours
Monday through Saturday, 8:00 a.m. to 5:30 p.m. Nothing on Sundays or federal holidays.
Work hours (opens the official site) - 03
Exterior changes
The Architectural Review Board reviews and advises; the Town Council gives the final approval. Plans are drawn by a licensed architect.
The Architectural Review Board (opens the official site) - 04
Dumpsters
The Town gives no construction debris service; dumpsters come from Waste Management only. A permit with no activity for six months is void.
The Building Department (opens the official site)
From the published rules, checked October 2026. Rules change; check the Town’s Building Department (opens the official site) for your property.
Questions
Not here? Ask Philip.
Who issues building permits in South Palm Beach?
The Town of South Palm Beach’s own Building Department, at 3577 South Ocean Boulevard. Applications go online through My Government Online (MGO), with the Town picked as the jurisdiction, not the County.
What are the construction hours in South Palm Beach?
Monday through Saturday, 8:00 a.m. to 5:30 p.m. No work on Sundays or federal holidays.
Does a condo renovation in South Palm Beach need the association?
Yes. The Town’s master permit is signed by the homeowner, the general contractor and the condo or HOA representative.
Who approves exterior changes in South Palm Beach?
The Architectural Review Board reviews them and advises the Town Council, which gives the final approval for any exterior building permit, or landscaping that needs a permit.